Skip contents

Products

Pelican

Installation
• the concrete foot is installed below ground level; if the stand is removable, the top of the concrete foot must be flush with the ground level
• the foot plate is secured at ground level, for example with the aid of chemical anchors, to a  fixed base
• the portal frame is installed below ground level
• the Pelican is secured to a wall with four screws through the back wall of the casing
• The Pelican is secured to a lamppost with steel bands

Pelican
Pelican