Skip contents

Products

Defens

Installation
Models for installation below ground level
• Installation with concrete feet: this model is installed using pre-cast concrete feet or loose concrete feet supplied with the unit and shrink-free cement (the top of the concrete foot is visible at the surface).
• Installation without concrete feet: installation during construction by means of poured concrete
Models for installation at ground level
• The model for installation at ground level is supplied with footplates which can be attached to hard surfaces using chemical anchors.

Defens